![]() |
Custom size: 1.28''- 32.0'' | ![]() |
![]() |
Custom function: waterproof, gloved touch, passive pen, maximum 10 points touch, multi interfaces and different systems; |
|
![]() |
Optical processing of cover glass: Anti-Glare, Anti-Reflection, Anti-Fingerprint etc. |
|
![]() |
FANNAL's particular technology can allow one more layer on customer's cover glass. |
|
![]() |
Steps: 3 days for formal drawings after the confirmation of project, 4~6 weeks for custom samples. For urgent project, emergency channel will be started, and 15 days for custom samples. For more details, please contact us. |
Treatment on Cover Glass
*Shape: cutting, punching etc.
*Silk Print: color, LOGO etc.
*Material: Corning, AGC, Schott etc.
*Thickness: 0.55, 0.7, 1.0, 1.1, 1.8, 2.0, 3.0, 4.0, 5.0, 6.0mm
Sensor
*Narrow Routing: narrowest 0.03mm
*Thickness: 0.4, 0.55, 0.7, 1.0, 1.1mm
FPC:shape design optional
Driver IC:Cypress,Atmel,EETI,Focaltech,Goodix etc.
Interface Support:IIC,USB,RS232,SPI etc.
Bonded to TFT
*Adhensive Tapes Bonding
*OCA Bonding
*TFT provided by customer
Development Support
1st Stage Confirmation of Touch Screen Specification
The below specifications must be confirmed.
* Touch screen type? (size, structure)
* Software platform? (Windows7, XP, Linux….)
* Hardware platform
* Interface? (IIC or USB etc.)
* Number of touch points
* Dimension,thickness and material of cover glass
* Touch via fingers, gloves or pen?
* Position of origin of coordinates
2nd Stage Prototype Production
If our standard touch screen cannot meet your requirements on cover glass,
or an additional cover glass is required, we will tailor a new tooling
that meets your specific requirements.
3rd Stage Controller Tuning
Once prototype touch screen has been done, we will tune its firmware to the best.
4th Stage Prototype Evaluation
1) You will test the prototype and feedback us the result. Retune is supported if necessary.
2) If the tune is failed in your part, please just forward us the platform information and we will help you with the touch screen tuning.
5th Stage Mass Production
Once approved, it will move to mass production stage.It starts with material preparation,goes on with quality control, and ends with accurate schedule. We are ready for mass production at any time.
Contact Us Careers Privacy Site Map FAQ Why FANNAL?